Centrica Storage Limited is an international energy provider, and the company has offshore gas platforms located in the North Sea.
ES Steel was commissioned by Centrica to install a steel structure as part of efforts to upgrade a main gas terminal. However, this work had to be completed while the plant was still in operation. Improvements were made to the pig receiver, the par install, the pipework, the metering structure, and the high and low-level platforms. Concrete units also had to be removed and replaced with underfloor steel.
All of this work was completed with minimal disruption to the daily operation of the Centrica site, and the team exceeded expectations with regards to health and safety procedures